Backlog

TODO:

  • Matriculator V1.5 (updates provided by NP, takes place of V2.0)
  • Update Civilian Matriculator login to be email only (part of V1.5)
  • Complete tech times automation
  • Fix Matriculator emails for Dark Mode (Amrit Bath)
  • Fix homepage link from logo tagline in reg system
  • Restore remaining blog posts Feb 3 (Half done)
  • Fix Adriana’s email signature (Mar 15)
  • Fix variable fields in OKS email 8/1/23

IN PROGRESS:

  • Lemons Forum (clean up design, implement changes) Mar 3
  • Diagnose “never received forum activation email” 7/7/23

DONE:

  • GA4 (P1)
  • Lemons Store (clean up design, implement changes) Feb 17
  • Reduce database size / hosting cost for staging site Jan 27
  • Fix OKS issues 6/15/23 email with Dillon
  • Fix team withdraw confirmation screen (submitted to WSD 6/15)

DEFERRED:

  • Pager Duty (TBD)
  • Lemons App Sponsored by eBay Motors (pending exploration w wayfare) (TBD)

Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *